4R6 Tashkent – Chirchik – Charvak on a site of 13-50 km

Client : Road Fund under the Ministry of Finance of Uzbekistan

Project Duration : 32 months

Works :
Speed of movement – 80 km/h;
7 bridges;
I category with 33.92  km long highway (2 and 4 lanes);
Width carriageway – 15,0 m- 22,5 m;
First an overpass through the railway by total length of 52 m;
25 pipes in diameter of 1,2 m by total length of 475,0 m;
On a line of of construction site makes an accomplishment of one ring crossing in one Level and junctions in one level in amount – 17 pieces.

Services Provided : Geodesic and geotechnical surveys and analyses; Preliminary, final and as-built design excl. the bridge; Civil Engineering of project; Technical consultancy during construction.