Overhaul roads of Namangan region (161 km)
Client : Road Fund Ministry of Finance of the Republic of Uzbekistan
Capital Investment : 70 000 000 USD
Project Duration : 23 months
Works :
Total length of road is 161 km. In this project was designed 32 existing bridges and 334 of culverts.
At the present time ongoing construction works.
The World Bank provided funding for reconstruction and development.
Services Provided : Preliminary Design;
Designing bridges and culverts;
Geodesic and geotechnical surveys and analyses;
Preliminary, final and as-built design excl. the bridge;
Technical consultancy during construction.